UFC 1-300-09N
25 May 2005
Provide the following sheets, as a minimum, for the design development submittal:
Plumbing Floor Plan. Show plumbing fixtures, floor drains and equipment
locations.
Site Plan. Show connection to base steam distribution, location of propane
and oil tanks, layout of ground coupled heat pump well fields, etc.
HVAC Floor Plan. Show equipment locations, one or two-line duct layout
and preliminary piping runs.
Mechanical Room Plan. Show major equipment and maintenance access
space. Provide section view(s) to clarify layout and supports.
9-4.1.2
Calculations.
Provide the following calculations, as a minimum, accompanying the Design
Development submittal:
Energy Analysis. Provide a bound copy of the computerized energy
analysis that includes input and output data in their.
Life Cycle Cost Analysis. Submit the computerized LCC analysis utilizing
the latest edition of the NIST Building Life-Cycle Cost.
Building Heating and Cooling Load. Provide a bound copy of the
computerized load calculations with input and output data in their entirety.
ASHRAE 90.1 Compliance Calculations. Submit calculations and
compliance forms indicated in the Basis of Design.
9-4.2
Pre-Final Design Submittals.
9-4.2.1
Drawings.
Plumbing and mechanical drawings must be complete to the extent that they may be
released for bid as submitted.
9-4.2.2
Calculations.
Submit all calculations to support the plumbing and mechanical systems and the major
equipment comprising those systems. Update the 35% energy analysis with the
equipment efficiencies scheduled on the drawings.
9-4.2.3
Basis of Design.
Resubmit Basis of Design. Update information as necessary, including sustainable
design validation/certification information required .
9-4.3
Final Design Submittals.
9-4.3.1
Drawings.