UFC 1-300-09N
25 May 2005
Short Circuit
Voltage Drop
Lighting
Load Analysis
Motor Starting/Flicker Analysis
Sag, Tension, and Guying Analysis
Manhole Design Calculations
Cable Pulling Tension Calculations
Cathodic Protection Calculations
CATV Network Loss Calculations
d) Redlined Specifications
e) Design must be free of conflicts between the contract drawings and the
specifications.
f) Response to Previous Submittal Review Comments
g) Updated Electrical Design Check List
h) Sustainable design validation/certification information required in UFGS 01331 of the
project RFP.
9-5.4
Final Design Submittals.
There are two instances where Design-Build construction documentation may vary from
Design-Bid-Build documentation. In Design-Build, the Contractor may submit
manufacturer's catalog data for a particular product in lieu of a prescriptive specification.
The other instance is that shop drawings can be included as design drawings. Refer to
the Design-Build RFP for additional direction for these two instances.
a) The final submission must incorporate the corrections and clarifications noted on the
100% submittal.
b) Include the Pre-Final submittal reviewer comments with replies.
c) Typed Specifications.
d) Design Analysis to reflect the final design.
e) Calculations, including all updates to substantiate the final design.
f) Sustainable design validation/certification information required in UFGS 01331 of the
project RFP.
55