UFC 1-300-09N
25 May 2005
Load Analysis
Service size
Feeder size
Larger special circuit sizes
n) Outline Specifications
o) Response to Previous Submittal Review Comments
p) Electrical Design Checklist
q) Sustainable design validation/certification information required in UFGS 01331 of the
project RFP.
9-5.3
Pre-Final Design Submittals.
There are two instances where Design-Build pre-final documentation may vary from
Design-Bid-Build documentation. In Design-Build, the Contractor may submit
manufacturer's catalog data for a particular product in lieu of a prescriptive specification.
The other instance is that shop drawings can be included as design drawings. Refer to
the Design-Build RFP for additional direction for these two instances.
Submittal must include all requirements of the previous submittal plus additional detail
to bring them to the specified completion percentage. Drawings and specifications must
be substantially complete at this stage and require only minor corrections if any.
Legend and Abbreviations
Existing Site and Demolition Plan
Lighting Plans and Details
Power Plans and Details
Power - Single Line Diagram
Telephone Riser Diagram
Intercommunication Riser Diagram
Fire Alarm Riser Diagram: Include only when separate Fire Protection
Drawings are not included in the design.
Other Riser Diagrams for Television, Security, Etc.
Panel Schedules
Switchboards and Motor Control Center Schedules
Lighting Fixture Details
a) Updated Design Analysis to substantiate design level shown.
b) Sequence of Construction when applicable.
c) Updated Calculations from previous submittal to substantiate design level shown
including the following as applicable.