UFC 1-300-09N
25 May 2005
Submit the final plumbing and mechanical drawings in accordance with UFC 3-400-10N.
9-4.3.2
Calculations.
Submit the final plumbing and mechanical calculations, revised and updated, in
accordance with UFC 3-400-10N.
9-4.3.3
Basis of Design.
Resubmit Basis of Design. Update information as necessary, including sustainable
design validation/certification information required ..
9-5
ELECTRICAL SUBMITTALS.
The following are typically required for Design-Build projects. Refer to the RFP for the
exact submittal requirements for each project.
9-5.1
Concept Design Submittals.
Listed below are design submittal requirements for specific levels of design completion.
Not all submittals listed may be required. The SOW or RFP indicates the number of
and required completion percentage (e.g., 35%, 100%, Final) of all submittal
requirements. Only those submittals listed in the SOW are required and each required
submittal must follow the guidelines indicated below.
9-5.1.1
Concept Design Submittals. Submittal need not provide extensive
details but must be complete enough to thoroughly express the Designer's intentions
and include the following:
Existing Site and Demolition Plan. Plans must include all existing site
information such as buildings, pavements and utilities. All electrical
demolition must be shown and indicated by legend. Do not include
demolished features on subsequent drawings. Indicate existing exterior
power and telecommunications distribution to a point of connection.
Site Plan. Show new and remaining aboveground and underground
electrical lines and equipment. Show other utilities in proximity to
electrical utilities. Information on existing conditions shall be complete and
field checked. Show proposed Power and Telecommunications cabling
and routing.
Single Line Diagram (Not a Riser) including Pad mounted transformer or
substation with primary and secondary protective devices. Show
Secondary feeders to major items of equipment.
Preliminary floor plans with dedicated space clearly identified for electrical
and telecommunications rooms. Show proposed locations for large
equipment such as HVAC connections, Switchgear or Switchboards, and
400 Hertz equipment, etc.