UFC 3-580-10
14 July 2004
Including changes 12 April 2005
DPOP 11-Redundant Small Site (1 to 33 Seats) [Two 1-Ton A/C units - Preferred]- EXT. UPS
VOLT
CABINET EQUIPMENT AMPS
SITE COOLING AMPS
FEEDER AMPS
TPP FEEDER
COOLING
Heat to
MODE
BK
Wire Size
(VOLT/Phase)
Phase A
Phase B
Phase A
Phase B
Phase A
Phase B
Room
AMP/POLE
(Btu/hr)
120/208/1 PH.
50/2
3#8, #10 G, 1"C
11,150
NORMAL
16
12
20
20
36
32
DPOP 11-Redundant Small Site (1 to 33 Seats) [One 2-Ton A/C units - Alternate] - EXT. UPS
VOLT
CABINET EQUIPMENT AMPS
SITE COOLING AMPS
FEEDER AMPS
TPP FEEDER
COOLING
Heat to
MODE
BK
Wire Size
(VOLT/Phase)
Phase A
Phase B
Phase A
Phase B
Phase A
Phase B
Room
AMP/POLE
(Btu/hr)
120/208/1 PH.
50/2
3#8, #10 G, 1"C
11,150
NORMAL
15
12
17
17
31
28
DPOP 2- Non-Redundant Small Base _2 (86 to 250 Seats) [A/C 1 TON UNIT]
VOLT
CABINET EQUIPMENT AMPS
SITE COOLING AMPS
FEEDER AMPS
TPP FEEDER
COOLING
Heat to
MODE
BK
(VOLT/Phase)
Phase A
Phase B
Phase A
Phase B
Phase A
Phase B
Wire Size
Room
AMP/POLE
(Btu/hr)
120/208/1 PH.
NORMAL
13
11
10
10
23
21
50/2
3#8, #10 G, 1"C
9,078
120/208/1 PH.
UPS FAILURE
24
-
10
10
34
10
DPOP 23- Non Redundant Small Base_2 (86 TO 250 Seats) [Two 1-Ton A/C unit ]-EXT.UPS
VOLT
CABINET EQUIPMENT AMPS
SITE COOLING AMPS
FEEDER AMPS
TPP FEEDER
COOLING
Heat to
MODE
BK
Wire Size
(VOLT/Phase)
Phase A
Phase B
Phase A
Phase B
Phase A
Phase B
Room
AMP/POLE
(Btu/hr)
120/208/1 PH.
50/2
3#8, #10 G, 1"C
8.522
NORMAL
8
8
20
20
28
28
57